ENGLISH
La vitrine de diffusion des publications et contributions des chercheurs de l'ÉTS
RECHERCHER

Performance Assessment of Transfer Lines with Unreliable Transfer Mechanism and Non-Negligible Transfer Times

Téléchargements

Téléchargements par mois depuis la dernière année

Plus de statistiques...

Dhouib, K., Gharbi, Ali et Abdelwahed, H.. 2012. « Performance Assessment of Transfer Lines with Unreliable Transfer Mechanism and Non-Negligible Transfer Times ». In Proceedings of the 3rd 2012 International Conference on Industrial Engineering and Operations Management (Istanbul, Turkey, July 3-6, 2012) pp. 1856-1865. Istanbul, Turkey : IEOM Forum.

[thumbnail of Performance-Assessment-of-Transfer-Lines-with-Unreliable-Transfer-Mechanism-and-Non-Negligible-Transfer-Times.pdf]
Prévisualisation
PDF
Performance-Assessment-of-Transfer-Lines-with-Unreliable-Transfer-Mechanism-and-Non-Negligible-Transfer-Times.pdf

Télécharger (127kB) | Prévisualisation

Résumé

This paper deals with automated production lines composed of multiple machines in series interconnected by a common and automatic transfer mechanism. The automated production line is dedicated to manufacturing a specific product type. The transfer mechanism and production machines are subject to random operation dependent failures. The automated transfer mechanism has a non-negligible transfer time. The purpose of this paper is to propose new analytical formulations to assess the steady-state availability and the throughput of such production lines. Based on several production line configurations, and compared to simulation results, the paper proves first the exactness and the robustness of the proposed models. The paper also shows the impact of the transfer mechanism operational, reliability, and maintainability parameters on the overall performance of automated production lines.

Type de document: Compte rendu de conférence
Informations complémentaires: 3rd 2012 International Conference on Industrial Engineering and Operations Management
Professeur:
Professeur
Gharbi, Ali
Affiliation: Génie de la production automatisée
Date de dépôt: 13 déc. 2013 20:49
Dernière modification: 11 mars 2016 16:20
URI: https://espace2.etsmtl.ca/id/eprint/6421

Actions (Authentification requise)

Dernière vérification avant le dépôt Dernière vérification avant le dépôt