Allaoui, H., Artiba, Abdelhakim and Aghezzaf, E..
2005.
« Jointly scheduling n jobs and preventive maintenance on the two machine flow shop to minimize makespan ».
In Industrial Engineering and System Management (IESM) (Marrakech, Morocco, May 16-19, 2005)
Rechercher dans Google Scholar
Item Type: | Conference proceeding |
---|---|
Professor: | Professor Artiba, Abdelhakim |
Affiliation: | Génie de la production automatisée |
Date Deposited: | 21 Sep 2015 15:40 |
Last Modified: | 21 Sep 2015 15:40 |
URI: | https://espace2.etsmtl.ca/id/eprint/10832 |
Actions (login required)
View Item |