Gharbi, Ali and Villeneuve, L..
1993.
« Simulation: a tool to balance a bufferless multi-product assembly line ».
In International Conference on Industrial Engineering and Production Management (Mons, Belgium, June 2-4, 1993)
pp. 593-602.
Rechercher dans Google Scholar
Item Type: | Conference proceeding |
---|---|
Professor: | Professor Gharbi, Ali |
Affiliation: | Génie de la production automatisée |
Date Deposited: | 21 Sep 2015 15:41 |
Last Modified: | 21 Sep 2015 15:41 |
URI: | https://espace2.etsmtl.ca/id/eprint/11035 |
Actions (login required)
View Item |