Pellerin, R. et Gharbi, Ali.
2007.
« Production control of remanufacturing systems with general repair time distributions ».
In International Conference on Industrial Engineering and Systems Management (IESM) (Beijing, China, May 30-June 2, 2007)
The full text of this document is not available here.
Item Type: |
Conference proceeding
|
Professor: |
|
Affiliation: |
Génie de la production automatisée |
Date Deposited: |
21 Sep 2015 15:41 |
Last Modified: |
21 Sep 2015 15:41 |
URI: |
https://espace2.etsmtl.ca/id/eprint/11187 |
Actions (login required)
 |
View Item |