Pellerin, R. and Gharbi, Ali.
2007.
« Production control of remanufacturing systems with general repair time distributions ».
In International Conference on Industrial Engineering and Systems Management (IESM) (Beijing, China, May 30-June 2, 2007)
Rechercher dans Google Scholar
| Item Type: | Conference proceeding |
|---|---|
| Professor: | Professor Gharbi, Ali |
| Affiliation: | Génie de la production automatisée |
| Date Deposited: | 21 Sep 2015 15:41 |
| Last Modified: | 21 Sep 2015 15:41 |
| URI: | https://espace2.etsmtl.ca/id/eprint/11187 |
Actions (login required)
![]() |
View Item |

