Boton, Conrad, Kubicki, Sylvain and Halin, Gilles.
2015.
« 4D/BIM simulation for pre-construction and construction scheduling. Multiple levels of development within a single case study ».
In Creative Construction Conference 2015 (Krakow, Poland, June 21-24, 2015)
pp. 500-505.
Diamond Congress Ltd.
Preview |
PDF
Boton C. 2015 12390 4D-BIM simulation for pre-construction.pdf - Published Version Use licence: All rights reserved to copyright holder. Download (277kB) | Preview |
Abstract
4D modeling has been an applied research area for around two decades since the first seminal works. In the last years, a number of case studies have been published both for demonstrating the various applications of 4D and for assessing technological propositions. However, in most papers only little place is given to the particular content of 4D models. In parallel, following the growing implementation of Building Information Modelling, 4D is usually recognized as a “BIM use”. In BIM protocols, the Level Of Development of datasets is a fundamental issue. This paper describes two distinct 4D uses conducted on a single pilot project. They aim to assess the levels of graphical and temporal details required for the implemented uses. The authors finally discuss the diversity of 4D uses with 4D models, both planned or ad-hoc, as well as the logical understanding related to 4D LOD.
Item Type: | Conference proceeding |
---|---|
Editors: | Editors ORCID Hajdu, Miklós UNSPECIFIED Skibniewski, Mirosław J. UNSPECIFIED |
Additional Information: | L'article est disponible dans les actes de la conférence http://2015.creative-construction-conference.com/proceedings/ |
Professor: | Professor Boton, Conrad |
Affiliation: | Autres |
Date Deposited: | 01 Mar 2016 21:26 |
Last Modified: | 10 May 2016 18:02 |
URI: | https://espace2.etsmtl.ca/id/eprint/12390 |
Actions (login required)
View Item |