Ait El Cadi, Abdessamad, Gharbi, Ali et Artiba, Abdelhakim.
2016.
« MATLAB/SIMULINK -VS- ARENA/OPTQUEST: Optimal production control of unreliable manufacturing systems ».
In 11ème Conférence Francophone de Modélisation, Optimisation et Simulation (MOSIM) (Montréal, QC, Canada, Aug. 21-24, 2016)
MOSIM.
The full text of this document is not available here.
Item Type: |
Conference proceeding
|
Additional Information: |
Thématique : LU-2-5-Simulation ; Identifiant de l'article: paper_137 |
Professor: |
|
Affiliation: |
Génie de la production automatisée |
Date Deposited: |
28 Jun 2017 18:22 |
Last Modified: |
28 Jun 2017 18:22 |
URI: |
https://espace2.etsmtl.ca/id/eprint/15508 |
Actions (login required)
 |
View Item |