Ouaret, Samir, Kenné, Jean-Pierre and Gharbi, Ali.
2019.
« Production and replacement planning of a deteriorating remanufacturing system in a closed-loop configuration ».
Journal of Manufacturing Systems, vol. 53.
pp. 234-248.
Compte des citations dans Scopus : 20.
Rechercher dans Google Scholar
Official URL: https://doi.org/10.1016/j.jmsy.2019.09.006
Item Type: | Peer reviewed article published in a journal |
---|---|
Professor: | Professor Kenné, Jean-Pierre Gharbi, Ali |
Affiliation: | Génie mécanique, Génie des systèmes |
Date Deposited: | 14 Nov 2019 20:17 |
Last Modified: | 14 Nov 2019 20:17 |
URI: | https://espace2.etsmtl.ca/id/eprint/19785 |
Actions (login required)
![]() |
View Item |