de Souza, A., Melhado, S., Henry, E. et Sabbatini, F..
2003.
« Quality systems remodelling by the method of site works preparation and proactive co-ordination: the French experience ».
In Proceedints of the CIB W99 International Conference on Construction Project Management Systems:The Challenge of Integration : Construction Project Management Systems: The Challenge of Integration (Sao Paulo, Brazil, March 23-25, 2003)
Rotterdam : CIB.
Rechercher dans Google Scholar
Official URL: https://www.irbnet.de/daten/iconda/CIB1488.pdf
Item Type: | Conference proceeding | ||
---|---|---|---|
Professor: |
|
||
Affiliation: | Autres | ||
Date Deposited: | 28 Apr 2020 13:35 | ||
Last Modified: | 28 Apr 2020 13:35 | ||
URI: | https://espace2.etsmtl.ca/id/eprint/20558 |
Actions (login required)
![]() |
View Item |