FRANÇAIS
A showcase of ÉTS researchers’ publications and other contributions
SEARCH

Integrated hub location and flow processing schedule problem under renewable capacity constraint

Rostami, Mohammad et Jabbarzadeh, Armin. 2021. « Integrated hub location and flow processing schedule problem under renewable capacity constraint ». Computational and Applied Mathematics, vol. 40, nº 5.

The full text of this document is not available here.
Rechercher dans Google Scholar
Item Type: Peer reviewed article published in a journal
Professor:
Professor
Jabbarzadeh, Armin
Affiliation: Génie des systèmes
Date Deposited: 28 Jul 2021 20:44
Last Modified: 28 Jul 2021 20:44
URI: https://espace2.etsmtl.ca/id/eprint/22914

Actions (login required)

View Item View Item