Larbi, Rim, Khalaf, Abrar and Brahimi, Nadjib.
2016.
« Scheduling aluminum billet casting lines: A case study ».
[Conference paper]. Journal of Industrial and Intelligent Information, vol. 4, nº 4.
pp. 257-262.
Rechercher dans Google Scholar
Official URL: https://dx.doi.org/10.18178/jiii.4.4.257-262
| Item Type: | Peer reviewed article published in a journal |
|---|---|
| Additional Information: | Thématique : 2nd International Conference on Industrial and Business Engineering (ICIBE) (Shanghai, China, July 03-05, 2016) |
| Professor: | Professor Larbi, Rim |
| Affiliation: | Autres |
| Date Deposited: | 28 Aug 2023 18:01 |
| Last Modified: | 29 Aug 2023 19:19 |
| URI: | https://espace2.etsmtl.ca/id/eprint/27484 |
Actions (login required)
![]() |
View Item |

