ENGLISH
La vitrine de diffusion des publications et contributions des chercheurs de l'ÉTS
RECHERCHER

Construction simulation and environmental impact analysis: Towards a 4D-based analysis of road project variants

Téléchargements

Téléchargements par mois depuis la dernière année

Plus de statistiques...

Ngbana, Théophile E., Yonkeu, Samuel et Boton, Conrad. 2023. « Construction simulation and environmental impact analysis: Towards a 4D-based analysis of road project variants ». Sustainability, vol. 15, nº 20.

[thumbnail of Boton-C-2023-27937.pdf]
Prévisualisation
PDF
Boton-C-2023-27937.pdf - Version publiée
Licence d'utilisation : Creative Commons CC BY.

Télécharger (14MB) | Prévisualisation

Résumé

Road construction work has a multitude of impacts on its host environment, and the effect of these impacts varies according to the areas it crosses. Taking these impacts into account from the earliest stages of project planning is the ideal approach pursued by planners to ensure that their plans not only take these impacts into account but also mitigate their effects as much as possible. Drawing up a project schedule that considers the impact of the work requires an in-depth understanding of its scale, spatial extent, and timing. In practice, however, such an understanding is difficult to achieve due to the complex and variable nature of impacts. To help project planners understand the impacts of a road project from the outset so they can better plan mitigation measures, we have developed a conceptual framework for four-dimensional Building Information Modeling (4D BIM) deployment that visualizes the most significant impacts on the project site’s surrounding environment in terms of their spatial extent and progression over time. By testing the method on a case study of a road improvement project in northwestern Quebec, the method shows that, compared with traditional 2D methods, the proposed 3D and 4D impact visualization modeling provides an integral perspective for visualizing and understanding spatial changes in project impacts over time and enables different possible project implementation variants to be evaluated with relative ease

Type de document: Article publié dans une revue, révisé par les pairs
Professeur:
Professeur
Boton, Conrad
Affiliation: Génie de la construction
Date de dépôt: 03 nov. 2023 17:43
Dernière modification: 03 nov. 2023 17:43
URI: https://espace2.etsmtl.ca/id/eprint/27937

Actions (Authentification requise)

Dernière vérification avant le dépôt Dernière vérification avant le dépôt