Boton, Conrad, Kubicki, Sylvain et Halin, Gilles.
2015.
« The challenge of level of development in 4D/BIM simulation across AEC project lifecyle. A case study ».
In 4th Creative Construction Conference (Krakow, Poland, June 21-24, 2015)
Coll. « Procedia Engineering », vol. 123.
pp. 59-67.
Krakow, Poland : Elsevier Ltd.
Compte des citations dans Scopus : 56.
Prévisualisation |
PDF
Boton C. 2015 12319 The Challenge of Level of Development.pdf - Version publiée Licence d'utilisation : Creative Commons CC BY-NC-ND. Télécharger (23MB) | Prévisualisation |
Résumé
4D modeling has been an applied research area for around two decades since the first seminal works in the nineties. In the last years, a number of case studies have been published both for demonstrating the various applications of 4D and for assessing technological propositions. However, in most papers only little place is given to the particular content of 4D models. In parallel, following the growing implementation of Building Information Modeling, 4D modeling process is usually recognized as a “BIM use”. In BIM implementations and protocols, the Level Of Development of datasets is a fundamental issue. This paper describes the application of two distinct “4D uses” conducted on a single pilot project. They aim to assess the levels of graphical and temporal details required for the implemented uses. The authors finally discuss the diversity of 4D uses with 4D models, both planned or ad-hoc, as well as the logical understanding related to 4D LOD.
Type de document: | Compte rendu de conférence |
---|---|
ISBN: | 18777058 |
Professeur: | Professeur Boton, Conrad |
Affiliation: | Autres |
Date de dépôt: | 16 févr. 2016 17:10 |
Dernière modification: | 10 mai 2016 14:38 |
URI: | https://espace2.etsmtl.ca/id/eprint/12319 |
Actions (Authentification requise)
Dernière vérification avant le dépôt |