ENGLISH
La vitrine de diffusion des publications et contributions des chercheurs de l'ÉTS
RECHERCHER

Method to design coordinates multiple views adapted to user's business requirements in 4D collaborative tools in AEC

Boton, Conrad, Kubicki, Sylvain et Halin, Gilles. 2011. « Method to design coordinates multiple views adapted to user's business requirements in 4D collaborative tools in AEC ». In Proceedings of the 2011 15th International Conference on Information Visualisation (IV) (London, UK, July 13-15, 2011) pp. 96-101. IEEE Computer Society.
Compte des citations dans Scopus : 11.

[thumbnail of Boton C. 2011 12377 Method to Design Coordinated Multiple Views.pdf]
Prévisualisation
PDF
Boton C. 2011 12377 Method to Design Coordinated Multiple Views.pdf - Version acceptée
Licence d'utilisation : Tous les droits réservés aux détenteurs du droit d'auteur.

Télécharger (637kB) | Prévisualisation

Résumé

The issue of multiple views coordination became more and more challenging in the architecture, engineering and construction (AEC) field since the apparition and the increasing success of 4D/nD CAD. In order to adapt visualization to user's business requirements in 4D-supported collaborative tools, this paper propose a method to design coordinated multiple views based on Model-Driven Engineering (MDE). The method enables user's visualization needs description, visualization modes comparison. The aim is to choose appropriate visualization modes business needs, to associate interaction principles and coordination mechanisms in order to compose coordinated multiple views adapted to actor's business needs. The paper presents a case study based on literature review and interviews with construction sector practitioners.

Type de document: Compte rendu de conférence
Professeur:
Professeur
Boton, Conrad
Affiliation: Autres
Date de dépôt: 01 mars 2016 21:27
Dernière modification: 16 nov. 2021 15:44
URI: https://espace2.etsmtl.ca/id/eprint/12377

Actions (Authentification requise)

Dernière vérification avant le dépôt Dernière vérification avant le dépôt