ENGLISH
La vitrine de diffusion des publications et contributions des chercheurs de l'ÉTS
RECHERCHER

Acceleration of cement blended with calcined clays with CaCl2, microlimestone and CSH seeds

Ouellet-Plamondon, Claudiane, Scherb, Sebastian, Köberl, Mathias et Thienel, Karl-Christian. 2021. « Acceleration of cement blended with calcined clays with CaCl2, microlimestone and CSH seeds ». In 11th ACI/RILEM International Conference on Cementitious Materials and Alternative Binders for Sustainable Concrete (En ligne, June 07-10, 2021) Coll. « ACI Special Publication », vol. SP-349. pp. 71-83. American Concrete Institute.

[thumbnail of Ouellet-Plamondon-C-2021-25792.pdf] PDF
Ouellet-Plamondon-C-2021-25792.pdf - Version acceptée
Accès restreint à : Administrateur seulement
Licence d'utilisation : Tous les droits réservés aux détenteurs du droit d'auteur.

Télécharger (1MB) | Demande de copie

Résumé

Supplementary cementitious materials (SCM) are needed to reduce the carbon impact of cementitious materials. Especially calcined clay mixtures are a sustainable alternative which is available abundant worldwide. Although strength of binders containing calcined clays may exceed at 28 days the reference cement, there is still one shortcoming: The early strength development is too slow for many applications. In order to overcome this obstacle calcium chloride, microlimestone and CSH seeds were tested in different dosages as hydration accelerator and the most promising dosage was determined by calorimetry and mortar tests. The accelerators increased the amplitude of the maximum heat flow and shortened the time when Qmax occurred compared to the blended binder made with calcined clay. They also acted as a strength accelerator. The reactivity index slightly increased with the calcium chloride and the microlimestone; with CSH seeds it was on the level of the blended binder.

Type de document: Compte rendu de conférence
Éditeurs:
Éditeurs
ORCID
Tagnit-Hamou, A.
NON SPÉCIFIÉ
Professeur:
Professeur
Ouellet-Plamondon, Claudiane
Affiliation: Génie de la construction
Date de dépôt: 14 nov. 2022 19:44
Dernière modification: 20 janv. 2025 16:00
URI: https://espace2.etsmtl.ca/id/eprint/25792

Actions (Authentification requise)

Dernière vérification avant le dépôt Dernière vérification avant le dépôt