ENGLISH
La vitrine de diffusion des publications et contributions des chercheurs de l'ÉTS
RECHERCHER

Review of accelerated construction of bridge piers - methods and performance

Téléchargements

Téléchargements par mois depuis la dernière année

Plus de statistiques...

Kenarkoohi, Mohammadreza et Hassan, Munzer. 2024. « Review of accelerated construction of bridge piers - methods and performance ». Advances in Bridge Engineering, vol. 5, nº 1.

[thumbnail of Hassan-M-2024-28394.pdf]
Prévisualisation
PDF
Hassan-M-2024-28394.pdf - Version publiée
Licence d'utilisation : Creative Commons CC BY.

Télécharger (2MB) | Prévisualisation

Résumé

Bridges are an essential part of every road and transportation system, and all countries must build bridges to improve their infrastructure. Accelerated bridge construction (ABC) is an innovative approach that has been noticed in recent years to facilitate and accelerate the process of building, repairing, or replacing bridges. This paper underscores the significance of ABC in bridge construction, focusing on its potential to offer speed, safety, and enhanced longevity for bridge pier. Through a comprehensive exploration of prefabricated elements and systems specific to bridge piers, insights into their applicability, advantages, and limitations are presented. A special section is dedicated to the investigation of pier connections under seismic loads. Furthermore, the review contrasts ABC with traditional construction methodologies, highlighting areas of excellence and potential improvement for ABC.

Type de document: Article publié dans une revue, révisé par les pairs
Professeur:
Professeur
Hassan, Munzer
Affiliation: Génie de la construction
Date de dépôt: 04 mars 2024 15:51
Dernière modification: 11 mars 2024 16:05
URI: https://espace2.etsmtl.ca/id/eprint/28394

Actions (Authentification requise)

Dernière vérification avant le dépôt Dernière vérification avant le dépôt