FRANÇAIS
A showcase of ÉTS researchers’ publications and other contributions
SEARCH

Review of accelerated construction of bridge piers - methods and performance

Kenarkoohi, Mohammadreza and Hassan, Munzer. 2024. « Review of accelerated construction of bridge piers - methods and performance ». Advances in Bridge Engineering, vol. 5, nº 1.
Compte des citations dans Scopus : 12.

[thumbnail of Hassan-M-2024-28394.pdf]
Preview
PDF
Hassan-M-2024-28394.pdf - Published Version
Use licence: Creative Commons CC BY.

Download (2MB) | Preview

Abstract

Bridges are an essential part of every road and transportation system, and all countries must build bridges to improve their infrastructure. Accelerated bridge construction (ABC) is an innovative approach that has been noticed in recent years to facilitate and accelerate the process of building, repairing, or replacing bridges. This paper underscores the significance of ABC in bridge construction, focusing on its potential to offer speed, safety, and enhanced longevity for bridge pier. Through a comprehensive exploration of prefabricated elements and systems specific to bridge piers, insights into their applicability, advantages, and limitations are presented. A special section is dedicated to the investigation of pier connections under seismic loads. Furthermore, the review contrasts ABC with traditional construction methodologies, highlighting areas of excellence and potential improvement for ABC.

Item Type: Peer reviewed article published in a journal
Professor:
Professor
Hassan, Munzer
Affiliation: Génie de la construction
Date Deposited: 04 Mar 2024 15:51
Last Modified: 11 Mar 2024 16:05
URI: https://espace2.etsmtl.ca/id/eprint/28394

Actions (login required)

View Item View Item