ENGLISH |
Liste des publications de "Artiba, Abdelhakim"Nombre de documents archivés : 16. 2008
Iassinovski, Serguei, Artiba, Abdelhakim et Fagnart, Christophe.
2008.
« SD Builder® : a production rules-based tool for on-line simulation, decision making and discrete process control ».
Engineering Applications of Artificial Intelligence, vol. 21, nº 3.
pp. 406-418.
Ramudhin, Amar, Paquet, Marc, Artiba, Abdelhakim, Dupré, Pierre, Varvaro, Dominic et Thomson, Vince.
2008.
« A generic framework to support the selection of an RFID-based control system with application to the MRO activities of an aircraft engine manufacturer ».
Production Planning and Control, vol. 19, nº 2.
pp. 183-196. 2007
Duvivier, David, Roux, O., Dhaevers, V., Meskens, N. et Artiba, Abdelhakim.
2007.
« Multicriteria optimisation and simulation: an industrial application ».
Annals of Operations Research, vol. 156, nº 1.
pp. 45-60.
Tchikou, Mahmoud, Gouarderes, Eric, Ramudhin, Amar, Artiba, Abdelhakim et Lamarque, Nicholas.
2007.
« Agent-based approach for manufacturing dynamic scheduling ».
In International Conference on Service Systems and Service Management (SSSM) (Troyes, France, Oct. 25-27, 2006)
pp. 834-840.
Piscataway, NJ, USA : Institute of Electrical and Electronics Engineers. 2006
Allaoui, Hamid et Artiba, Abdelhakim.
2006.
« Scheduling two-stage hybrid flow shop with availability constraints ».
Computers and Operations Research, vol. 33, nº 5.
pp. 1399-1419.
Allaoui, Hamid, Lamouri, Samir et Artiba, Abdelhakim.
2006.
« Using Johnson's algorithm to approximate some flow shop scheduling problems with unavailability periods ».
[Article de conférence]. IFAC Proceedings Volumes, vol. 39, nº 3.
pp. 45-50.
Ramudhin, Amar, Paquet, Marc, Artiba, Abdelhakim, Dupré, P., Varvaro, D. et Thomson, V..
2006.
« Improving logistics activities for maintenance, repair and overhaul using RFID technology ».
In Logistique & Transport (LT) (Hammamet, Tunisia, Apr. 30-May 2, 2006)
2005
Allaoui, H., Artiba, Abdelhakim et Aghezzaf, E..
2005.
« Jointly scheduling n jobs and preventive maintenance on the two machine flow shop to minimize makespan ».
In Industrial Engineering and System Management (IESM) (Marrakech, Morocco, May 16-19, 2005)
Allaoui, H., Artiba, Abdelhakim et El Mhmedi, A..
2005.
« Stochastic scheduling of two machine flow shop with an availability constraint to minimize expected makespan ».
In 35th Conference on Computers & Industrial Engineering (Istanbul, Turkey, June 19-22, 2005)
pp. 93-98.
Allaoui, Hamid et Artiba, Abdelhakim.
2005.
« Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints ».
Computers and Industrial Engineering, vol. 47, nº 4.
pp. 431-450.
Artiba, Abdelhakim, Fenies, P. et Tchernev, N..
2005.
« La modélisation d'une unité générique de soins pour le système d'information et d'aide à la décision de la supply chain du nouvel hôpital d'Estaing ».
In Conception et Production Intégrées (CPI) (Casablanca, Maroc, 9-11 nov. 2005)
Bardey, D., Riane, F., Artiba, Abdelhakim et Eeckhoudt, L..
2005.
« To maintain or not to maintain? What should a risk-averse decision maker do? ».
Journal of Quality in Maintenance Engineering, vol. 11, nº 2.
pp. 115-120.
Duvivier, D., Artiba, Abdelhakim et Dhaevers, V..
2005.
« Simulation based performance measurement and analysis: an industrial application ».
International Journal of Computer Integrated Manufacturing , vol. 18, nº 5.
pp. 402-407.
Jamali, M. A., Ait-Kadi, D., Cléroux, R. et Artiba, Abdelhakim.
2005.
« Joint optimal periodic and conditional maintenance strategy ».
Journal of Quality in Maintenance Engineering, vol. 11, nº 2.
pp. 107-114.
Lassinovski, S., Artiba, Abdelhakim et Fagnart, C..
2005.
« A generic production rules-based system for on-line simulation, decision making and discrete process control ».
In International Conference on Industrial Engineering and Systems Management (IESM) (Marrakech, Morocco, May 16-19, 2005)
Ramudhin, Amar, Paquet, Marc, Artiba, Abdelhakim, Varvaro, D., Thomson, V., Dupré, P. et Dumouchel, M..
2005.
« Maintenance, repair and overhaul activities in aeronautic industry : a framework to support the design and deployment of a new control strategy using radio frequency identification technology ».
In International Conference on Industrial Engineering and Systems Management (IESM) (Marrakech, Morocco, May 16-19, 2005)
pp. 1261-1270.
|