Assid, M., Gharbi, Ali et Hajji, A..
2015.
« Joint production, setup and preventive maintenance policies of unreliable two-product manufacturing systems ».
International Journal of Production Research, vol. 53, nº 15.
pp. 4668-4683.
Compte des citations dans Scopus : 38.
Prévisualisation |
PDF
Joint production, setup and preventive maintenance policies of unreliable two-product.pdf Télécharger (1MB) | Prévisualisation |
Résumé
This article addresses the problem of joint optimization of production, setup and maintenance activities of unreliable manufacturing system producing two products. Given the complexity of the problem in a dynamic and stochastic environment, the literature has treated the problem separately by considering each axis individually (setup, production and maintenance) or by combining two axes simultaneously (production-setup; production-maintenance). Following the trend of scientific research advances that supports the fact that an integrated control leads to best performances, the main objective of this paper is to provide a control policy that will simultaneously combine the production, the setup and the preventive maintenance activities. To tackle the problem, an experimental resolution approach using combined continuous/discrete event simulation models is considered. The aim is to accurately imitate the production system behavior and to optimize the control policy parameters which minimize the total cost incurred. An in-depth study of the effects of the system parameters variation on the performance of the studied policies is performed in order to draw meaningful conclusions and to illustrate the robustness of the proposed resolution approach.
Type de document: | Article publié dans une revue, révisé par les pairs |
---|---|
Professeur: | Professeur Gharbi, Ali |
Affiliation: | Génie de la production automatisée |
Date de dépôt: | 13 mai 2015 16:34 |
Dernière modification: | 15 avr. 2016 09:10 |
URI: | https://espace2.etsmtl.ca/id/eprint/9560 |
Actions (Authentification requise)
Dernière vérification avant le dépôt |